Colors shown are digital references of the RAL Classic standard and may vary by monitor and substrate. Final color is confirmed with physical sample boards before mass production.
Buyer Decision Snapshot
All 195 RAL Classic colors can be supplied as powder coating, in smooth gloss, semi-gloss, matt and textured finishes. Use this page to shortlist a code, then confirm it the way production will run it: the same code can look different in a matt finish, on a different substrate, or between resin systems, so the final approval is always made on a physical sample board.
Selecting and ordering a RAL color
- How RAL and Pantone color matching works
- Polyester powder coatings for exterior color
- Epoxy powder coatings for interior color
- Metallic and bonded metallic finishes
Commercial terms we confirm before quoting
We confirm MOQ, sample quantity, development and production time, QC documents, freight options and payment terms in one quotation, so buyers can compare the total delivered cost instead of only the ex-works price.
Frequently Asked Questions
Can you match a color that is not in the RAL Classic range?
Yes. We can match RAL Design, Pantone, NCS, a competitor product, or a physical sample you send. Send the reference plus the surface it will be applied to, and we prepare a test panel for approval before production.
Why does the color look different on my screen?
Digital references vary with monitor calibration, and gloss, texture and substrate all shift how a color reads in daylight. The colors shown here are digital references to the RAL Classic standard; the final color is confirmed with physical sample boards before mass production.
What is the MOQ?
Stock RAL colors are typically 25-100 kg per color. Custom colors often start at 100 kg or more per color. Samples can usually be prepared at 1-5 kg, and we confirm the exact MOQ by finish, package and destination.
What is the lead time?
Stock colors are typically produced within 7 working days after approval; custom colors usually need 7-15 working days. QC and packing add 1-3 working days. Sea freight from Xiamen/Fuzhou is often 25-45 days, while air freight is often 3-10 days.
